![]() |
10037
Barringer Foreman Road |
![]()
BASF
GeismarRiver-water Control Building

This $85,000 project consisted of the construction of a 32 x 17x 17 eave height, new Control Building built on the dock above the Mississippi River. It consists of a standing seam roof and has design loads much greater than those required by code due to the wind expected on the river.
Contact us at Moore Construction on how we may assist you in achieving your goals and project needs!