![]() |
10037
Barringer Foreman Road |
![]()
Dow
ChemicalMCC Building #4517

This $300,000 project consisted of the construction of a 40 x 84x 20 eave height, new MCC Building with an interior UPS battery room . The building consisted of a galvanized structural steel frame and metal decking. Roofing material was an EPDM roof system with stainless steel flashing, gutters and downspouts. A total of 50 tons of air conditioning was installed. MOORE self-performed all work except roofing and HVAC.


Contact us at Moore Construction on how we may assist you in achieving your goals and project needs!